My Winter 2019-2020 project is finished. Valve/head overhaul, new main/connecting rod bearings, rings, water pump, and new clutch. TA works perfect. Approximately 130 hours of run time since mechanical work was done running a 15 foot batwing mower. Seat replaced along with a built suspension. New steering wheel, new tie rods, new knees, new axel tube, new top link, and muffler. New 18-4 x 34 rears with new rims, and new 9-50 x 15 with new rims. 10 suit case weights,1 pair of split rear weights, and 9 bolt dual hubs. Not a perfect paint job but this is a working tractor not a show queen. Everything works, lights, horn and lighter.